This technical talk presents the collaborative delivery of slope stabilisation works at Cloghan Point, where concerns regarding movement of a railway cutting earthwork prompted intervention. The project combines approximately 1,500 m² of soil nailing and reinforced facing with local slope regrading and targeted surface-water drainage improvements.
Representatives from the Client, Designer and Contractor teams will explain how the problem was identified, investigated and developed into a practical permanent solution, including the temporary works needed for safe delivery.
The presentation will explore construction planning, site management and liaison with neighbouring landowners. It will conclude with the specialist construction methods adopted on the constrained railway site, including innovative above-line operations used to install the works safely while managing access, operational and environmental constraints.