ICE - G&S Webinar on MiC System in Hong Kong – Design & Construction Considerations

9th June 2021 2:00 pm

Recently, an interesting “building block” construction method has emerged in the construction industry in Hong Kong. Similar to building LEGO blocks, the “Modular Integrated Construction” (MiC) method employs freestanding volumetric modules, with most of the interior fitting out installed, manufactured off-site and then transported to site for assembly. MiC not only minimises the duration of works on site, but also enhances productivity, site safety, environmental performance and cost-effectiveness.

ICE HKA G&S is honoured to have Mr Wilson Cheung, Director of Wilson & Associates Limited and Mr Andrew Lo, Senior Project Manager in Gammon Construction Limited, to present on the topic “MiC System in Hong Kong – Design & Construction Considerations” in this technical webinar. Mr Wilson Cheung, who has extensive experience in obtaining MiC In-Principle Acceptance from the Buildings Department in Hong Kong, will talk about the design considerations of MiC technology. Mr Andrew Lo will share his experience from the construction aspect of MiC with a case study of the Temporary Quarantine Facilities in Penny’s Bay.

Listed in Other Institutions' Events

Cite Top